CWAY Port Harcourt

CWAY PORT HARCOURT LTD.

CWAY PH, founded in 2000, has a production Park of about 23000 square meters, including an area of about 10000 square meters for factories and offices. Up to now, there is a production line of refill water with the capacity of 2000 BPH, a high-end production line of table water with the capacity of 12000 BPH. Three new production lines of table water will be built by the end of 2021 for the production of table water sizing 60cl, 75cl and 1.5L at the same time. The daily water treatment capacity will reach 400 tons. CWAY PH ranks top in its water treatment capacity and equipment modernization in Southeast Nigeria.